Fully glazed with new curtain walling
-
Exposed roof structure showcasing the traditional double arch trusses
-
Raised access floor with 150mm void
-
Flooring will comprise porcelain tiles, oak hardwood planks and carpet
-
Suspending ceiling system in office areas below the mezzanine
-
Mezzanine clad with mesh
-
LED lighting installed throughout in accordance with BCO and CIBSE guidelines
-
Dimmable office lighting
-
Heating and cooling via 4 pipe trench heaters located around the perimeter of the building and 4 pipe fan coil units located beneath the mezzanine floor.
-
Ventilation provides 12l/s of fresh air plus 10% based on an occupancy of 1 per 8 sq m, in accordance with the BCO guidelines